The Large River Cable Installation Project, located in Tebas District, Sambas Regency, West Kalimantan, involves the installation of an underwater power cable
Read MoreThe 150 kV High Voltage Underground Cable (SKTT) Priok Barat – TX Kemayoran was developed to enhance power reliability in North Jakarta, particularly around the Jakarta International Stadium (JIS)
Read MoreThe Abadi Guna Papan (GIS) – Mampang Project was implemented to enhance the reliability of electricity supply in one of Jakarta’s main business areas, particularly Mega Kuningan
Read MoreThe Project of 150 kV Underground Cable (SKTT) Danayasa – Senayan was implemented to replace the existing oil-filled cable installation, that aiming to improve electricity reliability in the Senayan, Gelora Bung Karno, and Danayasa areas
Read MoreTaman Rasuna – Abadi Guna Papan 150kV High Voltage Cable Project The Taman Rasuna – Abadi Guna Papan 150kV High Voltage Cable Project is a transmission system connecting the Taman Rasuna GIS to the Abadi Guna Papan (AGP) GIS. This installation serves as a critical role in enhancing the reliability of the Jakarta Looping System.
Read MoreThe Electric & Power Indonesia 2025 Exhibition was successfully held from 17 to 20 September 2025, in conjunction with the Construction, Mining, Oil & Gas, The Battery, and Data Center Asia Exhibitions, at JI-Expo Kemayoran, Jakarta. According to the event organizer, PT Pamerindo Indonesia, as the event organizer, the exhibition attracted a total of 14,927 visitors specifically for the Electric & Power Indonesia segment.
Read MoreThe project was launched to strengthen the reliability of the electricity supply in the North Jakarta area, particularly in the vicinity of the Jakarta International Stadium (JIS)
Read MoreCurrently, the company has successfully developed a high voltage underground cable (HVUGC) product with a mechanical shield in the form of extruded aluminium corrugared …
Read MorePT KMI Wire and Cable Tbk concerns for the health of the employees and residents living around the company. Therefore, the Covid-19 vaccination was carried out on 17 and 19 July 2021, located at SDN 01 Cakung Barat, East Jakarta.
Read MorePT KMI Wire and Cable Tbk has been awarded the Blue Rating of PROPER for period of 2019-2020 by the Ministry of Environmental and Forestry of the Republic of Indonesia.
Read More